Secure Checkout
  • VisaVISA
  • Mastercard
  • American ExpressAMERICANEXPRESS
  • Apple PayPay
  • Google PayGPay
  • Afterpayafterpay
  • KlarnaKlarna.
Duties Paid
United StatesCanadaAustraliaNew ZealandSingaporeUnited Arab EmiratesHong KongSouth KoreaThailand
Lab-Verified 99.991%90-Day Refund
Canada

Hydrogen Bath Machines in Canada

HERO Bath ships to Canadian addresses in the 120V NEMA 5-15 configuration, priced in Canadian dollars with duty and GST/HST prepaid — no courier brokerage fee, no disbursement charge and nothing collected at the door.

  • · 120V NEMA 5-15 configuration as standard
  • · Duty and GST/HST prepaid — no brokerage fees
  • · 24-month warranty supported direct from the manufacturer
  • · ISO 9001 manufacturing · CE · RoHS · FCC marks

Delivery windows across Canada

Orders are dispatched from Sydney and then run 10 business days door-to-door on the North American lane.

Greater Toronto, Montreal, Ottawa, Calgary, Edmonton, Metro Vancouver, the Atlantic provinces, northern British Columbia, the northern Prairies and the territories are all quoted the same 10 business day window; severe winter weather is the only thing that occasionally extends a final leg.

The machine arrives as a single crated pallet, delivered kerbside with a call ahead to schedule. For condo and apartment buildings, book the service elevator once the carrier confirms the delivery window.

Duty, GST/HST and brokerage

Canada is a DDP (delivered duty paid) destination for us. Import duty and GST/HST are prepaid before dispatch, so the shipment clears without you being invoiced.

That also removes the courier brokerage and disbursement fees that normally follow an imported appliance into Canada — the usual sting on cross-border orders where the freight cost looks low until customs charges land afterwards.

Pricing is set at USD $9,500 delivered and displayed here in Canadian dollars at the live rate, so the figure on screen is the landed cost.

Canadian electrical standard (120V, NEMA 5-15)

Canada runs 120V at 60Hz on the NEMA 5-15 outlet, the same as the United States. HERO Bath units routed to Canada are built in that configuration, so there is no transformer, adapter or rewiring involved.

Give the unit a dedicated grounded 15A or 20A circuit rather than sharing with a heater or hair dryer. The Canadian Electrical Code requires GFCI protection for bathroom receptacles, which is exactly what we recommend for a bath-adjacent appliance.

The hardware is manufactured under ISO 9001 and carries CE, RoHS and FCC marks. These describe hardware and manufacturing standards, not medical or therapeutic approval — HERO Bath is a general wellness device.

Cold-climate handling and hard water

Do not leave the machine in an unheated garage or store it in freezing conditions with water in the internal lines. If it arrives during a Canadian winter, let the crate sit indoors and reach room temperature before first use.

Municipal supply across much of the Prairies and southern Ontario is hard — Calgary, Regina, Winnipeg and parts of the GTA all sit at the harder end. An inline pre-filter on the fill line keeps scale off the internals and holds output steady.

Coastal BC and much of Quebec run soft water, where no additional filtration is needed.

Warranty and support in Canada

A 24-month manufacturer warranty runs from delivery, with a 90-day return window from arrival. Claims go straight to the Hydrogen Machines team — there is no Canadian distributor layer to work through.

Diagnostics are handled remotely first over email and WhatsApp; where a part is required, replacement parts ship to Canadian addresses with duties prepaid.

Support hours overlap Canadian evenings on the Eastern seaboard and Canadian mornings on the Pacific coast, and messages are answered within one business day.

FAQ

Frequently asked questions

Canadian addresses run 10 business days door-to-door on an express courier service. Toronto, Montreal, Vancouver, Calgary, Ottawa, Atlantic Canada, northern British Columbia and the territories are all quoted the same window.

Yes. Canadian units ship in the 110–120V / 60Hz configuration with a NEMA 5-15 plug, identical to the US standard, so it runs from an ordinary Canadian household outlet with no transformer.

No. Canada is a DDP destination for us — import duty and GST/HST are prepaid before dispatch, so the courier does not collect anything at the door and there is no customs brokerage or disbursement fee waiting for you.

Pricing is set at USD $9,500 delivered and displayed on this site in Canadian dollars at the live exchange rate, so you see the landed CAD figure rather than converting an Australian price yourself.

A 24-month manufacturer warranty applies from delivery, with a 90-day return window from arrival. Claims go directly to the Hydrogen Machines team by email and WhatsApp — there is no Canadian distributor in the loop — and replacement parts ship into Canada with duties prepaid.

Ready to choose?

See HERO Bath's full specification in Canadian dollars and confirm your delivery window, or compare it side-by-side with every other machine in the range.

Canonical · https://hydrogenmachines.com.au/hydrogen-bath-machine-canada

Research & Evidence

Our indexed reference library covers purity and water quality, safety and technology, dosage and delivery, hydrogen water and bathing, and tablet warnings.

Hydrogen Research & Evidence Hub →

Evidence‑Informed Engineering

HydrogenMachines™ systems are built using evidence‑informed engineering, natural materials, and transparent construction. Independent laboratory testing confirms gas purity and composition.