Key takeaways
- Dedicated 10A circuit per machine.
- 5+ minute turnover between sessions.
- Distilled water supply for the source reservoir.
Site preparation
Place the unit on a stable floor within reach of the tub. Leave 10 cm clearance for air intake. Provide a 10 A dedicated outlet. Schedule sessions with 5 minutes of turnover for water exchange and surface wipe-down.
Frequently asked questions
Related products
Related learning
Next lesson
Clinic setup
Continue →Ready to choose a machine?
Direct prices · free worldwide delivery · 12-month warranty.